Layer 3 (PLAN §5). Every rule traces to a source; the statements are those of the constraint notes this model is built from.
from qccd.verify import verify
from qccd.cost import deck_model
report = verify(prog, arch, deck_model())
report.rules.summary()
# {'passed': ['R1','R11','R12','R13','R14','R15','R18','R2','R3','R4','R4b',
# 'R5','R6','R6b','R7','R8','R9'],
# 'failed': [], 'partial': {'R15': ...}, 'skipped': {'R10': ..., 'R7b': ...}}
The reporting contract#
A rule reports passed only if the check ran. Otherwise it reports skipped with the reason, or partial with what is approximated. A verifier that prints a green tick for a check it did not run is worse than no verifier.
Every rule the verifier reports as passing on the shipped schedule is also exercised against a program built to break it. A check that cannot fail is not a check.
| rule | status here | what it actually checks |
|---|---|---|
| R1 | checked | occupancy(site) ≤ capacity after every cycle |
| R2 | checked | degree-≥3 nodes hold ≤ 1 ion, and ≤ 1 ion crosses one in a cycle |
| R3 | checked | ≤ segment.capacity participants per segment per cycle |
| R4 | checked | the movement class is declared; ≤ max_simd_classes_per_cycle per cycle. R4d (drivability), three frames and a hold clause: along a named loop every ion on a shared channel moves the same signed hop; on the spurs every acting dock moves the same way, and without per-site switches every spur on the channel must act; off any named path the instruction may not ask for more distinct motions (motion_signature) than a site has channel SETS -- one channel per electrode role, so the deck's 32 channels are 2 sets of 16 -- counted per class of sites that see the same channels. Which channel drives which site is NOT judged there: no device document partitions its sites across channels, and with a per-site switch the assignment is free. Two ions moving the SAME way in different places is still not judged either -- that is a layout question. Hold clause: without per-site switches, every LOADED site of a channel that carries a waveform must follow it, on a path or off one; a site no move leaves, enters or passes through is holding, and a hold needs a switch |
| R4b | checked | a cycle has one mode, and never mixes transport with gates |
| R5 | checked | no (u→v) together with (v→u) on one segment |
| R6 | checked | gate/measure/cool only where the zone type allows, at the replayed site |
| R6b | checked | both ions of a pair co-located; sites, when present, cross-checked |
| R7 | checked | n̄ ≤ budget for both ions at gate time (before the gate's own elapsed-time heating) |
| R7b | skipped | no architecture declares a per-zone duty-cycle budget yet |
| R7c | checked | gates under a heating model with no cooling scheduled anywhere is a violation; skipped under a model with no heating |
| R8 | checked | ion set invariant; no ion participates twice in a cycle; no position change without a participant |
| R9 | checked | claimed totals, per-batch figures and per-instruction annotations vs the replay |
| R10 | skipped | needs symbolic permutation + Pauli-frame tracking against a QASM DAG |
| R11 | checked | unidirectional per loop per cycle; every junction degree is priceable |
| R12 | checked | ≤ 1 gate per trap per cycle |
| R13 | checked | ≤ 15 ions in a trap at gate time |
| R14 | checked | a split from a chain of > 2 needs an accounted gate_swap; intra-chain order is not tracked (init places a set), so the check is conservative: it charges every such split, edge ion or not |
| R15 | partial | quanta composed additively, which R15 says is an upper bound |
| R16 | checked when the model models heating | gate error evaluated from the carried n̄, not a constant |
| R17 | checked when the model models time | anomalous heating accrued per elapsed µs |
| R18 | by construction | junction cost charged by the degree the expanded graph reports |
| R19 | checked | no node joins more rails than budget.max_junction_degree (default 4: a 2D surface trap has T- and X-junctions and nothing denser; a 3D trap may declare 6) |
| R20 | checked | at every node with two or more rails, any two of them subtend at least budget.min_rail_angle_deg (default 60°; a symmetric X-junction is 90°) |
| R21 | checked | rails are planar: a rail passes through no node it does not end at, and two rails cross only at a node they share -- the drawing must be a surface trap |
| R22 | checked | one transport cycle is one waveform: every ion that moves in a simd cycle has the same motion signature (class, and hop by hop the same path direction, spur direction or lab-frame axis); a site may opt out, never do something else. Skipped only when control.model is direct |
| R23 | checked | a junction is crossed, not rested on: no ion ends a cycle on a node where three or more rails meet while the traps off the junctions have room for every ion. Not a violation: a slot of a loop or rail the programme moves as a conveyor, or a device with no such room |
R19-R21, the geometry rules (2026-09). These three read the document alone: node positions and the segment list, no programme, no technology. They exist because a graph that is not a surface trap can still be replayed, priced and even verified against R1-R18 -- a Tanner graph laid out as rails, a torus whose wrap wires are drawn as chords across the die -- and every number such a page reports is a number about a machine that cannot be built. geometry_violations(arch) files one violation per offending node (R19), per pair of rails (R20), and per rail-through-node or rail-crossing (R21), all at instruction -1; Machine.violations() reports them after every edit, and the browser mirrors them (geometryViolations, a sibling of architectureViolations so each family keeps its own enumeration and its own parity diff). The two limits are document fields under budget, with the surface-trap defaults when absent. The ring generator used to draw its two corner docks ON the end-cap rail (a spur at 0° to the rail: R20 and R21 both fire); it now runs a corner spur outward, so every shipped ring passes. A periodic grid (grid(..., periodic=True)) cannot pass R21 on a plane and is not meant to: cylinder is the planar drawing of the same torus.
R22, one waveform (2026-09). Broadcast control means one waveform per cycle, and the general router batched every hop that departed at the same time slot into one cycle whatever its direction, which R4d only counted against the number of channels. R22 asks the strict question the collaborator asked -- only the exact same operation may run simultaneously -- through motion_signature(view, ion), which the compiler's uniformising pass shares, so a programme the pass emits is a programme R22 accepts by construction. Rigid rotation is uniform by construction; a dock batch is uniform when every rider docks the same way.
R4d, holding still and counting sets (2026-10). An author of the WISE/WISER line of work pointed out two gaps in how R4d read the wiring, and both were real. The deck's broadcast count 12*2 + 4*2 is not a differential pair: "every DC is wired through a two-way switch" (deck p.19), so each electrode role has two banks of DACs, one carrying the motion waveform and one the hold waveform, and a site's switch selects which it follows. That is WISE's N_set = 2, "stay or swap" (arXiv:2305.12773, Table I; Sec. II A: "it suffices to use one DAC per waveform"), and arXiv:2403.00756 gets the same selection from "one digital input per site". So a 32-channel broadcast plane plays ONE motion plus a hold per cycle. First gap: a HOLD is a waveform too. R4d judged a loaded site that sat out a cycle only on the path that moved (or beside a dock), so on a switchless ring a docked ancilla took the rotation's waveform with nothing asking whether it could stay put, and a loop rider away from a dock took the dock waveform likewise. The hold clause now asks it everywhere: without a per-site switch, a loaded site on an engaged channel that no move leaves, enters or passes through is a violation, reported once per site and never again for a site the path or spur clause already named. Every shipped device declares switch_per_site: true and is unaffected; the switchless ring designs of now fail on their compiled programmes (docked ancillas during rotations, idle riders during dock and undock) and pass on the same programmes with the switch. The argument that keeps R4d silent ACROSS paths -- whether one waveform moves two ions alike is a field solve -- is about two moving sites, and it stays. Second gap: a motion drives every electrode role of its cell, so k distinct motions need k channel SETS (ControlPlane.banks, channels per site / roles), not k channels; the off-path count compared k with all 32. The hold is not counted there, because with a switch a site may simply disconnect (WISE fn. [46]). What a programme asks of the banks -- motions plus the hold per cycle, the ceil(log2 k) select bits a switched plane loads (WISE Table I), and the shim demultiplexer's charging time t_sc = M x t_ec, t_ec = 3 µs (WISE Sec. V B 3; its design is 1:128 with N_se/(M - 1) shim DACs, the deck's 1:100 being its rounded figure) -- is a census of the programme, not a rule: qccd.cost.waveforms.waveform_census and hardware_report(arch, census=...).
R23, junctions are crossed (2026-10). R2 bounds how many ions a junction holds at an instant; it never said an ion may not stay, and a router that read it as a capacity parked ions there. On a hexagon lattice whose corners were declared as sites, a Steane round stopped an ion on a corner 77 times, once for 17 instructions, with empty traps on every side. R23 judges where an ion RESTS: a node where three or more rails meet (R18, whatever the node was declared as) may be crossed inside one move and may not be where a cycle leaves an ion. Two cases are excluded by name. A slot of a loop the programme rotates is part of a conveyor, which carries every ion through every slot, the dock slots of a ring included; so is a slot of a named open path that the programme moves with a shift class (every hop of the cycle along that one path), like the conveyor rails of a transversal-CNOT station, whose sites each have a rung to a gate trap and so meet three rails. And if the traps off the junctions cannot hold the programme's ions (capacity capped at R13's chain limit, as the compiler counts it), some ion must stand on a crossing and the rule does not apply. The general router leaves junction sites out of its trap graph under exactly this test, so a compiled programme passes by construction; each stay is reported once, at the cycle it begins.
The same rules between gadgets. A machine built of gadgets is still one chip. Every op of a place is a programme on that place's device and is judged by R1-R23. The roads between the places are judged by the same rules: every carry is compiled with its whole bundle onto its road's own device, one class a cycle, and replayed by this verifier. A door's stub is driven by one side at a time. The schedule is timed by these programmes. The machine rule H1 (road_ok) and the place check of the same name report it (GADGETS.md §4.2). When a floorplan says that devices share one plane of DACs or one laser, they are one set of channels under these same rules: one waveform at a time across all of them. Rule H2 (plane_conflicts() = 0) judges every instant of the composed programme (GADGETS.md §4.3).
R15 in detail. The true composition is n̄_tot = n̄_hom + n̄_inhom + 2√(n̄_hom·n̄_inhom)·cos θ, whose interference term can be negative — a phase-aware schedule can cancel excitation. The corpus supplies no secular phase model for these primitives, so Charge.then adds. Every quanta figure the platform reports is therefore an upper bound, and says so.
R9 is model-scoped. The deck's 397 184 / 8 808 are facts about the deck's cost model, not about the program. Checking them against a replay under a different model would be a category error, so a program records meta.metrics_model and R9 skips with the reason when it does not match.
R9's coverage is reported, not assumed. It checks total_cost, total_steps, total_rotate_hops, contacts, batches, runtime_us, total_quanta, cooling_us and peak_quanta at the program level; cost, steps and contacts per batch; and cost, steps, t0, t1 per instruction. The replay computes no per-instruction quanta_delta or operating_point, so when a program carries those annotations R9 lists them under not_checked and reports itself as partial. Replaying with keep_cycles=False leaves no per-instruction trace to check against, which is likewise reported as partial rather than passing — a memory knob must not double as a correctness knob.
only_rules is a request, not a certificate. Naming a rule that has no implementation puts it in skipped, never in passed.
The one place the deck's own rule needed disambiguating#
The artifact states:
rotation_cost_rule: one rigid one-slot rotation moves every occupied data ion; corner edges cost 3 primitive hops, straight edges cost 1rotation_step_rule: one rigid hop takes the maximum primitive edge depth used by any moving ion in that hop
Three readings give a defensible 148 per hop on the 2×72 ring. Only one gives 148 and depth 3:
| reading | cost | depth |
|---|---|---|
corner segment (both endpoints are loop corners) costs 3: 142×1 + 2×3 | 148 ✓ | 3 ✓ |
each of the 4 corner slots costs 3: 140×1 + 4×3 | 152 ✗ | 3 |
each of the 4 corner-entering segments costs +1: 140×1 + 4×2 | 148 ✓ | 2 ✗ |
So the cost is charged to the segment that contains a whole turn — in a height-2 ring, the two end-caps. Device.corner_endpoints[seg] == 2 identifies exactly those, and both 148 and 3 are computed from the expanded graph rather than supplied as constants (Knowledge: fd_deck_corner_cost_is_per_segment).
This matters beyond bookkeeping: PLAN §0.5 then replaces corner_hops = 3 with 1, and because the number was derived rather than hard-coded, that is a one-parameter change to the cost model and nothing else.
Cost models#
DeckModel is not a strawman kept for contrast; it is the oracle. M1 exists to prove the replay engine reproduces a schedule someone else computed, and that is only a proof if the model is theirs.
DeckModel | CorrectedModel | |
|---|---|---|
| corner segment | corner_hops = 3 | corner_hops = 1 (R18: a bend is ordinary transport) |
| degree-≥3 node | uniform, +1 hop / +1 step | junction_cross at that degree: 100 µs, 3.0 quanta |
| split / merge | not modelled | 80 µs, 6 quanta each, on the classes that entails them |
| heating | not modelled | per-ion n̄, by component |
| wall clock | not modelled | microseconds, from the curves |
Shuttle speed and junction time as variables (2026-09). The reviewers asked for the transport speed along a rail and the time to cross a junction to be variables rather than fixed per-hop numbers. The junction time already is one: the junction_cross curve point at the node's degree, declared per document. The shuttle time can now be derived from a speed: corrected_model(shuttle_speed_m_s=..., pitch_um=...) charges a rail hop length_um / speed microseconds, where length_um = Segment.length * pitch_um and pitch_um is what one lattice unit measures on the chip (the technology's nm_per_unit, 225 um on the ETH preset). Off by default, so every shipped number is unchanged until a study opts in; heating stays per hop.
Junction charging convention. A junction is charged on entry to a degree-≥3 node, once per move. Charging both entry and exit would double-count every transit; charging only exit would miss the last one. On entry, an ion completing one revolution of the shipped ring crosses each of the 24 docks exactly once — which is why "445 transits per data ion" comes out of the replay rather than out of a formula.
The junction crossing is that segment's transport, not something added after it: the ion does not shuttle for 5 µs and then spend another 100 µs at the junction, it spends 100 µs crossing. So durations overlap (max) while heating adds.
Cooling insertion#
Cooling is global — Doppler sheet beams cover the whole trap, so one operation cools every ion. It costs schedule time but does not serialize per ion.
The R7 trigger provably converges in one pass: a global cool zeroes every ion, so inserting one strictly lowers n̄ everywhere downstream; a gate that satisfied R7 before still does, and a gate that violated it now starts from zero. The pass asserts that on a re-replay rather than assuming it.
CoolingPolicy.max_gate_quanta overrides the architecture's budget and reaches R7 itself (via the replay's rule_config), so a budget sensitivity sweep actually changes the schedule rather than only the report.
An optional ion-loss trigger caps n̄ between cools regardless of when the next gate is (an ion survives only ~85 uncooled junction round trips before it is lost, arXiv:1210.3655). Two details it has to get right:
- Blame the instruction that crosses the cap, not the next one. An accumulation peaks at the end of the instruction that pushes it over, and a cool inserted after that instruction cannot undo the excursion. The pass probes before every instruction and attributes an over-cap reading to its predecessor.
- An instruction that jumps the cap on its own is unfixable. When a cool already sits immediately before it and the cap is still exceeded when it finishes, no cooling schedule satisfies the cap there; the pass names the instruction and stops, rather than padding the program with cools that cannot help or looping to its iteration limit.
peak_quanta_between_cools is the replay's running maximum of the live n̄, which a cool resets to zero — so it covers the stretch before the first cool and the tail after the last one. Sampling only at the cools would report a reassuring 0.0 for a program with no cooling at all, which is precisely the case the diagnostic exists to flag.
Where these came from#
The reporting contract above is not aspirational. An adversarial review of M0–M2 (six dimension reviewers, each finding independently verified by a refuter) raised 44 claims, of which 30 survived refutation and ~24 were distinct defects. Most were holes in checks that were being reported as passing: R6/R6b/R13 driven by an optional sites annotation rather than by the replayed positions, R8 false-firing on a multi-segment via, only_rules licensing rules with no implementation, R9 silently skipping its per-instruction granularity under keep_cycles=False, R7c sitting in no bucket at all, and the cooling pass's R7-budget knob being inert. None of them moved an M0/M1/M2 acceptance number; all of them are now regression-tested, each test named for the defect rather than for the fix.